Side-by-side worksheet
| Line item | Proposal A | Proposal B | Proposal C |
|---|---|---|---|
| Moisture source identified | |||
| Areas included, with measurements | |||
| Containment type and size | |||
| Negative air and exhaust point | |||
| Materials removed | |||
| Cleaning method for framing | |||
| Insulation removal and replacement | |||
| Drying and target readings | |||
| Coatings or antimicrobials | |||
| Asbestos testing addressed | |||
| Completion check or verification | |||
| Rebuild included or excluded | |||
| Moisture correction included or excluded | |||
| Records provided at the end |
Signals in a proposal
Encouraging
- Names the moisture source and how it was confirmed
- Specifies containment and air filtration
- Describes what is removed versus cleaned
- Explains how completion will be judged
Worth questioning
- One lump line with no breakdown
- Relies mainly on fogging or spraying
- No mention of what caused the water
- Vague language like treat affected areas
Making the comparison fair
Before comparing totals, make sure each proposal covers the same area and the same work. If one includes rebuilding drywall and another stops at removal, they are not competing for the same job. Ask each contractor to price the same scope, or to list what is left out.
It also helps to send every contractor the same photos and the same description, and to be home for each walkthrough. A contractor who spends time measuring and looking at the water source is gathering what an accurate scope needs.
Before you sign
- The scope is written and matches what was discussed
- Exclusions are listed
- The plan for unexpected findings is described
- Start date and expected duration are stated
- Payment schedule is tied to stages of work
- You know who to contact during the job
Common questions
- Should I just pick the lowest number?
- Only if the scopes truly match. A lower total often reflects a narrower job, such as no insulation replacement, no moisture correction or no rebuild. Fill in the worksheet first, then compare totals for the same work.
- How many estimates are enough?
- Two or three is typical for a planned job. More than that tends to add confusion rather than clarity, especially if each contractor proposes a different approach to the same crawlspace or basement.
- What if two contractors disagree about the cause?
- That is worth resolving before signing anything. Ask each to explain the evidence for their view, such as moisture readings, staining patterns or a plumbing test. An independent assessor can help if the disagreement persists, because the wrong diagnosis means the mold returns.
General information for Wheat Ridge, not a quote or professional advice. In an emergency, call 911.